How a build actually unfolds once work starts on site
Every project differs in scale, but most extensions and loft conversions follow a similar broad sequence from groundwork through to finishing trades.
Once approvals are in place and a start date is agreed, the site sequence generally follows a logical order dictated by what has to happen before the next stage can start. Foundations come before walls, walls before a roof, and a weathertight structure before internal finishes go in, though the exact pace depends on the scope, the weather and how many trades are involved at once.
Understanding the broad sequence helps homeowners plan around the disruption sensibly, know roughly when to expect noisy or messy stages, and recognise that quieter-looking periods, such as while plaster dries or while a structural engineer's detail is finalised, are a normal part of the process rather than a sign of delay.
We keep clients updated at each stage change so there are no surprises about what is happening on site and why, particularly during stages that involve access to the existing house rather than just the new build area.
Setup and groundwork
The first stage on site is usually setting up welfare facilities, protecting access routes, and marking out the building line before excavation begins. Groundwork includes digging and pouring foundations, laying drainage, and building up to damp proof course level, all of which typically needs a building control inspection before it is covered over.
This stage can look slow from the outside, since much of the early work is below ground and less visually dramatic than the walls that follow, but getting foundations right is the stage least forgiving of shortcuts.
Structure and roof
Once foundations are signed off, walls go up, whether blockwork, timber frame, or a mix depending on the design, along with any structural steel needed to form openings. The roof structure follows, and getting the building weathertight, meaning the roof covering and any external doors and windows are in place, is a key milestone because it protects the internal work that follows from the weather.
This is often the stage where the project visibly changes shape fastest, as the new space takes on its final form and scaffolding comes down from areas no longer needed.
First fix and services
First fix covers the trades that go in before walls are plastered: electrical cabling, plumbing pipework, and stud partitions where relevant. This stage often involves the most disruption inside an occupied house, since it can mean access through existing rooms to route new services.
Insulation goes in around this stage too, followed by plasterboard and plastering, after which the site quietens down considerably while everything dries out properly before decoration can begin.
Second fix and finishing
Second fix covers fitting kitchens, bathrooms, skirting, doors, sockets and switches, along with final connections for plumbing and electrics. Flooring, decoration and final snagging follow, and this stage is where the space starts to feel like a finished room rather than a building site.
Towards the end, a final clean and a walk-through with the client to check details closes out the build before handover, which is covered in more depth in our snagging and handover guide.
Common questions
Why does the site sometimes look quiet for a few days?
Some stages, such as plaster drying or waiting for a building control inspection, genuinely need time to pass before the next trade can start. It is a normal part of a properly sequenced build.
Can trades work on different parts of the project at the same time?
Yes, where the sequence allows it, such as roofers finishing external work while first fix electrics start inside a weathertight structure, which can help keep the overall programme moving.
What causes delays to this sequence?
Weather affecting groundwork and roofing, waiting on inspection sign-off, material lead times, and discoveries once existing structure is opened up are the most common causes of a stage taking longer than expected.
Will I be told before noisy or disruptive stages start?
Yes, we flag upcoming disruptive stages such as breaking through walls or roof work in advance so you can plan around them where possible.
Tell us about the job and we’ll come back with a clear next step.
Serving Paignton, Torbay & South Devon. Mon–Fri 08:00–17:00.
- Planning permissionWhen planning permission applies, when it does not, and how Torbay, Teignbridge and South Hams differ.
- Building regulationsHow Building Regulations approval works, what inspections happen and how it differs from planning permission.
- Party wall agreementsHow the Party Wall Act works, when notice is needed and why a schedule of condition protects everyone.
- Choosing a builderHow to vet a builder properly, compare quotes fairly, and judge communication before work begins.