Process & planning

Picking the right builder matters more than picking the cheapest quote

A good builder is judged on communication, transparency and the quality of finished work, not just the number at the bottom of a quote.

South Devon has plenty of building firms, from sole traders to larger contractors, and the quality and reliability on offer varies enormously. Choosing well starts with looking past the headline price and asking harder questions about experience, insurance, how the firm communicates, and whether previous clients would use them again.

A written quote should set out clearly what is included, what is excluded, and how variations are handled if the scope changes once work starts. Vague quotes with a single lump sum and no breakdown are harder to compare fairly and can hide gaps that surface as extra costs later.

It is also worth meeting whoever will actually be running your site day to day, not just the person who quoted the job, since the working relationship over the following weeks matters as much as the number on the paperwork.

What to check before you commit

Ask for proof of public liability insurance and, where relevant, professional indemnity cover if the builder is also providing design input. Check whether the firm is a limited company or a sole trader, since this affects your position if something goes wrong, and ask how long they have operated under their current trading name.

Photographs of previous work, ideally similar in scale to your project, tell you more than generic marketing claims. If you can see a completed extension or loft conversion in person, even better, since photos can flatter finishes that look different up close.

Comparing quotes fairly

Two quotes for the same brief can differ substantially if one includes items the other has left out, such as scaffolding, skip hire, making good to existing decor, or specific fittings. Ask each builder to itemise so you are comparing like with like rather than assuming the cheaper number represents the same scope of work.

Be cautious of a quote that is significantly lower than the others without an obvious reason, since it can indicate corners being cut, under-specified materials, or a builder who intends to recover the shortfall through variations once work is underway.

Communication and site conduct

Ask how updates will be communicated during the job, whether that is regular site visits, phone calls, or written updates at key milestones. A builder who is hard to reach before you have signed anything is unlikely to improve once the contract is agreed.

Site conduct matters too, particularly for occupied homes: how the team protects floors and furniture, keeps noise and dust to reasonable hours, and treats neighbours during work that might affect them, such as scaffolding on a shared boundary or deliveries blocking a narrow street.

Contracts and payment structure

A clear payment schedule tied to project stages protects both sides, rather than large sums requested upfront before work has started. Ask what happens if the scope changes, how variations are priced, and what the process is if a dispute arises over quality or completion.

For larger projects, a written contract setting out the programme, payment stages and responsibilities is worth having in place before work begins, even between parties who already trust each other.

Common questions

Should I always choose the cheapest quote?

Not automatically. Compare exactly what is included in each quote first, since a lower price sometimes reflects a narrower scope of work rather than better value overall.

How many quotes should I get?

Enough to compare fairly, usually a handful, but make sure each builder is quoting against the same brief and drawings so the comparison is meaningful rather than misleading.

Is it normal to pay a deposit before work starts?

Some builders ask for a deposit to secure materials or a start date, but it should be reasonable relative to the total project value and tied to a clear payment schedule for the rest of the job.

What if I am not happy with progress once work has started?

Raise concerns directly and promptly with the builder rather than letting frustration build. A good working relationship depends on clear, early communication from both sides.

Get a price

Tell us about the job and we’ll come back with a clear next step.

Serving Paignton, Torbay & South Devon. Mon–Fri 08:00–17:00.

Request a quote

Get a personalised response

Free, no-obligation quote · response within one working day.

By submitting, you agree to be contacted about your enquiry. See our privacy policy.

More in process & planning
Browse every guide in the guides library or see the areas we cover.