Comparing quotes side by side, not just the bottom line
Two quotes for what looks like the same job can differ by thousands, and the reason is almost never that one builder is simply cheaper.
Most homeowners send the same rough description of a job to three or four builders and expect three or four comparable numbers back. What usually lands is three or four documents built on different assumptions, different specifications and different amounts of detail, and comparing them on price alone tells you almost nothing useful about which one to pick.
A quote is only as good as the information it was built on. If one builder priced from a five-minute chat on the doorstep and another priced from a set of drawings with a specification attached, the numbers were never going to be comparable in the first place. The cheap one might be missing scope the expensive one included, or it might genuinely be a leaner, more efficient way of running the job.
This guide sets out what to actually look at when quotes land, so the decision is based on scope, sequencing and clarity rather than a single number at the bottom of the page.
Start by checking they quoted the same job
Before comparing figures, read each quote for what it actually includes. Does it name the same rooms, the same square meterage, the same fittings? A quote that says 'kitchen refit as discussed' gives you nothing to check against another quote that lists every unit, worktop run and appliance. Ask each builder to confirm scope in writing against the same brief if the documents do not already match up.
Watch for jobs that quietly exclude things homeowners assume are included, such as making good after first fix, disposal of waste, or decorating at the end. A lower figure that excludes skip hire and a higher one that includes it are not actually far apart once you add the missing pieces back in.
If a builder quoted without seeing the property, or without a proper survey of an extension footprint, treat that figure as provisional. A site visit changes numbers once ground conditions, existing services or access problems become clear.
- Match room sizes and areas across all quotes before comparing totals
- Check whether waste disposal and skip hire are included or extra
- Confirm whether decorating and making good are in scope
- Ask what happens if the quote was given without a site visit
Look at how the price is broken down
A single lump sum with no breakdown is hard to interrogate later. A quote broken into stages or trades, labour separated from materials, and any provisional sums flagged clearly, gives you something to check against as the job progresses and gives the builder a fair way to price genuine unknowns without inflating the whole number to cover themselves.
Provisional sums are common and honest where something cannot be priced accurately until it is opened up, such as the condition of a wall behind old plaster or what is found once floorboards come up. What matters is that they are labelled as provisional rather than buried inside a fixed price, which can let a builder quietly cover risk they have not told you about.
Check what is priced as standard versus optional
Two extensions of the same size can carry very different costs depending on the specification behind them: the insulation standard, the window type, the roof covering, the quality of fittings assumed. A lower quote built on a lighter specification is not automatically the worse choice, but you need to know that is what you are comparing before deciding.
Ask each builder to state the specification they have priced against, brand or grade where relevant, so you can weigh whether the saving on one quote reflects a genuinely leaner build or simply a lower-grade material choice you might not be happy with once it is installed.
- Ask what insulation, window and roofing specification is assumed
- Compare fittings and finish grade, not just brand names
- Query any specification gaps between quotes of similar scope
- Get the agreed specification written into the final contract
Payment terms and programme belong in the comparison too
A quote is not just a price, it is a proposed way of running the job. Look at the payment schedule being asked for, how it is staged against work completed, and whether it feels proportionate to the value of work done at each point. Look too at the stated programme, because an unrealistically short timescale can be a warning sign as much as a benefit.
It is reasonable to ask each builder how they sequence the trades, who is on site day to day, and how they would handle something unexpected turning up once work starts. The answers tell you far more about how the job will actually run than the number on the front page.
Trust and communication weigh as much as the number
By the time quotes are in your hand, you have usually already had at least one conversation with each builder. Note how clearly they explained things, whether they answered questions directly, and whether they seemed to actually listen to what you wanted rather than steering you toward what suited them. A slightly higher quote from someone who explained the job properly is often the safer choice over a cheaper one from someone who was vague.
If you are still unsure once the numbers and scopes are lined up, ask each builder the same follow-up questions and compare the answers rather than the price alone. Consistency, clarity and a willingness to put things in writing are worth more than a saving of a few hundred pounds on a job running into the thousands.
Get quotes you can actually compare
The easiest way to make comparison fair is to give every builder the same brief, the same access to the property, and the same list of questions, then insist on a written breakdown rather than a single figure. That puts the decision back in your hands instead of leaving you guessing at what each number actually covers.
If you would like a detailed, itemised quote for an extension, loft conversion or refurbishment in Torbay or South Devon to compare against others you have received, get in touch through our free quote page and we will give you a clear breakdown to weigh up properly.
Common questions
Why is one quote so much lower than the others?
It could reflect a leaner specification, missing scope, a builder underpricing to win the job, or simply lower overheads. Ask what is and is not included before assuming it is the better deal.
Should I always go with the middle quote?
Not automatically. The middle figure is only meaningful once you know all three cover the same scope and specification. A middle price built on a thin specification can still be poor value.
Is it fair to show one builder another's quote?
It is common practice, though some builders would rather requote based on your brief than react to a competitor's figure. Either approach can work as long as the scope stays clear.
How many quotes should I actually get?
Three is a sensible number for most domestic jobs. Fewer and you have little to compare against; many more and you risk wasting everyone's time, including your own, chasing marginal differences.
Tell us about the job and we’ll come back with a clear next step.
Serving Paignton, Torbay & South Devon. Mon–Fri 08:00–17:00.
- Planning permissionWhen planning permission applies, when it does not, and how Torbay, Teignbridge and South Hams differ.
- Building regulationsHow Building Regulations approval works, what inspections happen and how it differs from planning permission.
- Party wall agreementsHow the Party Wall Act works, when notice is needed and why a schedule of condition protects everyone.
- Choosing a builderHow to vet a builder properly, compare quotes fairly, and judge communication before work begins.